Year 10 Engineering

Year 10 Engineering students built the cheapest bridge using only spaghetti and Blu Tack, with the aim of  sustaining 1000g weight for at least 30sec. The bridge had a span of a minimum of 40cm and was at least 10cm at the highest point.

Skip to content